Tilson Guides Mass Broadband 123, Bringing Critical Broadband Access to Western Massachusetts

In 2008, 95 communities in Western Massachusetts had limited or no access to broadband communications. More than 220,000 households, 25,000 businesses, anchor institutions such as libraries and hospitals, and 1,200 public safety and other state facilities were on the disadvantaged side of the digital divide. Without high speed communications, businesses couldn’t compete regionally and globally, citizens had restricted access to e-healthcare, and the quality of education suffered.

Challenge

The situation began to change when the Congress passed the American Reinvestment and Recovery Act (ARRA) in 2009, and Massachusetts Governor Deval Patrick created the Massachusetts Broadband Institute, which was soon tasked with building a 1,300-mile fiber optic network that would give rural Massachusetts an on-ramp to the information superhighway.

The Institute had the funding and a committee of telecom industry experts overseeing the future of broadband connectivity for rural Massachusetts. What they needed was a company that could plan and manage the massive, and massively important, middle mile network build-out.

Solution

Tilson bid on and was awarded the project, serving as the owner’s project manager and consulting engineer. Tilson took on the strategic planning, route design, business modeling, cost estimation, test and acceptance procedure design and intergovernmental coordination between the Department of Transportation, public safety agencies and industry, as well as the construction management services. To give you some idea of the scale, they developed a comprehensive construction cost estimate for the design/build requirements, licensing and “make ready” efforts for over 20,000 Verizon, Western Mass Electric Company, National Grid, Unitil, and municipal light district owned utility poles.

Rounding out the solution, Tilson network engineers developed next-generation interoperability and design standards for the fiber optic DWDM (dense wavelength division multiplexing), data routing, voice transport, and switching facilities that control the network.

MassBroadband 123 now connects more than 120 western and central Massachusetts communities, exceeding the original scope of the initiative, and enhancing the quality of life for hundreds of thousands of people.

20,000 Utility Poles and Counting

Every project has milestones, one of which happened in September 2012, when Crocker Communications and Health New England became the first customers for the MassBroadband 123 network. Since then, Massachusetts has been recognized as a leading broadband state in a national study, several “last mile” projects were started to make the link between the middle mile and people, anchor institutions and businesses. MassBroadband 123 now connects more than 120 western and central Massachusetts communities, exceeding the original scope of the initiative, and enhancing the quality of life for hundreds of thousands of people.

Subscribe to get the latest insights from Tilson

Submit

Thank you for your interest in Tilson!

More Case Studies

Tilson Guides Maine State Library in Support of Statewide Digital Literacy Effort

Today’s libraries are a resource center for job searchers, seniors and businesses that need high-speed Internet connectivity.

More Case Studies

Tilson Helps AVANGRID Automate Energy Distribution in the Rugged Terrain of Central Maine

Southern and Central Maine's terrain presents a significant challenge to utility companies determined to bring 21st Century technologies to their customers.

More Case Studies

Tilson Wires the Big Dig for LTE Communications

The Central Artery/Tunnel Project, what we all know as the “Big Dig,” is arguably the most complex engineering project ever taken on in the U.S.

More Case Studies

Attention to Detail Drives Fast, On-Budget Broadband Wi-Fi Deployment for Keesler Air Force Base Barracks

Keesler Air Force Base in Biloxi, Mississippi is home to the 81st Training Wing.

More Case Studies

Tilson Helps New Hampshire DOT Make the Everett Turnpike Safer and Ready for the Future

100,000 vehicles travel the Everett Turnpike every day.

More Case Studies

Tilson's fast turnaround gets Bottomline Technologies up and running

Online financial transactions depend on fast, reliable, secure networks.

More Case Studies

Tilson Lets Buffalo Bills Fans Stay Connected At the Game

At the big game, football fans need beer, hot dogs, and Internet.

More Case Studies

Tilson Keeps AT&T's New England Customers Connected

Networks aren't going to maintain themselves.

More Case Studies

Tilson Speeds Three Ring Binder Project to Completion

When people at Tilson and the Maine Fiber Company talk about the Three Ring Binder, they aren’t thinking about a folder used to organize loose leaf paper.